Hotel in Panepistimiou Street, Athens

The systems were made with aquatherm blue pipe MF OT with oxygen tight for the four-pipe air-conditioning system. The aquatherm green pipe MF RP pipes were used in water supply systems. Also, aquatherm blue pipe MF SDR 17.6 was installed for the cooling towers. Finally, large diameter of prefabricated manifolds and prefabricated pipe parts were used.